top of page

United Mechanical News

Check out our latest projects!

IMG_1197.png

April 24, 2025

📍 Greencastle, IN – Plumbing underground work is underway at South Putnam High School.

This 30,000 sq. ft. fieldhouse addition is starting to take shape, with plumbing infrastructure going in to support what will be a first-class facility for students and athletes.

Always rewarding to see a project come to life from the ground up. 💪🚧

Collage.jpg

March 12, 2025

Making headway on our plumbing rough-in at the new Sarah Bush Lincoln medical office building in Vandalia

IMG_5184.HEIC

February 28, 2025

Here's a glimpse of our project at UIUC Noyes Lab. Check out all of those fume hoods! 🧪 🥼

IMG_2258.png

February 14, 2025

Making progress at Millikin University's new training facility! Our team has been hard at work installing steam piping, while B.E.C. Mechanical is getting the ductwork in place. Thankfully temporary heat is coming in next week to keep things moving smoothly! 🔧🔥

IMG_4462.HEIC

January 31, 2025

🛠️ Project Progress Update 🛠️

The team at United Mechanical Group is making great strides on the Large Metal Additive Manufacturing (LMAM) facility, located at the Research Park of the University of Illinois Urbana-Champaign.

We are currently roughing in:
◾ Process chilled water systems
◾ Lab gas systems
◾ Ductwork with the support of B.E.C. Mechanical
◾ Plumbing systems

IMG_6973_edited.jpg

January 17, 2025

🌨️ Bitter cold weather is here! ❄️

A reliable heating system is essential to keep your business warm and running smoothly. Check out this new furnace we recently installed—just one example of the commercial HVAC service work we do every day.

When the temperatures drop, trust us to keep the heat on. Give us a call at 217-954-0211

1733746114304.jpg

December 13, 2024

🏀🏐🏓 Excited to share a recent project we completed at Emerald Acres Sports Connection in Mattoon, IL!

This 140,000-square-foot fieldhouse is a versatile space designed for basketball, volleyball, pickleball, wrestling, and indoor soccer. It also features an arcade and event space for birthday parties, making it a hub for both sports and celebrations!

Our scope included:
✅ Rough-in and trim-out of plumbing fixtures for multi-use public restrooms, locker rooms, and kitchen
✅ Collaborating with BEC Mechanical to install ductwork and RTUs

We’re proud to have contributed to creating a space that brings the community together for recreation and events.

IMG_2851.png

October 11, 2024

🚧 Project Spotlight: Tuscola High School Renovation 🚧

United Mechanical Group recently had the privilege of working on an exciting renovation project at Tuscola High School! We upgraded the plumbing systems for the brand-new kitchen and cafeteria space and installed modern bathroom fixtures.

We're proud to contribute to this amazing transformation, helping create an updated and efficient environment for the students and staff.

IMG_1197 (002).jpg

September 26, 2024

The perfect spot for a quick coffee fix ☕ Check out the new self-serve Starbucks café at the I Hotel

image000004.JPG

August 23, 2024

Steel construction is advancing at Sarah Bush Lincoln in Vandalia. We’re excited to continue with our plumbing rough-in work this winter!

CABBI Collage.png

May 17, 2024

UIUC's Center for Advanced Bioenergy and Bioproducts Innovation (CABBI) Greenhouse is ready to grow 🌱✅

IMG_4027.jpg

April 26, 2024

Mattoon Sports Connection is starting to take shape! Looking forward to the sport memories that will be made in this state of the art facility

Piatt County Collage.png

April 4, 2024

Out with the old, in with the new! Chiller replacement at the Piatt County Office Building in Monticello

IMG_6552.jpg

March 1, 2024

Making headway at UIUC's new CABBI greenhouse in Research Park

IL-IN Logo_edited_edited.png

February 9, 2024

We are expanding to Indiana! Contact us if you would like a plumbing or HVAC bid for your next project

LabWorks Collage.png

January 4, 2024

Plumbing trim-out is wrapping up at the LabWorks building located in Research Park at the University of Illinois

IMG_2473.jpg

December 1, 2023

7 Brew Coffee in Urbana ✅ We were fortunate to work alongside BARBER & DEATLEY, INC. to install the plumbing, gas-fired patio heaters, and to perform start-up for HVAC

IMG_0156.jpg

November 17, 2023

Underground plumbing rough-in is complete and ready for concrete at UIUC's new CABBI greenhouse in Research Park

Parachute Collage.png

October 27, 2023

Project complete! Join Parachute is Charleston's newest plasma donation center that we were able to complete the plumbing and HVAC start-up for. We're happy to have a hand in healthcare!

Mark Denman Boilers.png

October 20, 2023

New boilers are installed at Mark Denman Elementary in Danville, IL. Just in time as colder weather approaches!

KMC Therapy Collage.png

April 28, 2023

Our work is wrapped up at Kirby Medical Center’s new Therapy and Wellness Center. Check out the heat piping and the therapy pool!

Thank you ENTEC Services for allowing us to be a part of this project!

IMG_0464.jpg

February 17, 2023

Backflow testing? We do that! Contact us to make sure your device is functioning properly

69332270438__EB08B976-E468-4BEE-BD8F-F3EB152EC4E1.JPEG

December 21, 2022

EIU Life Sciences' new reverse osmosis system, water softener, and carbon filter

IMG_9533.jpg

November 9, 2022

The trucks were squatting this morning! Crane pick with Custom Service Crane, Inc. for the rooftop units at Kirby Medical Center's new rehabilitation and fitness center

IMG_5029 - 2.jpg

October 21, 2022

Working alongside our trade partner, ENTEC Services, at the new Kirby Medical Center Rehabilitation and Fitness Center in Monticello. We are currently installing ductwork and heating piping, with gas piping and mechanical equipment to follow. To be completed by next spring!

IMG_5017.jpg

October 14, 2022

Brr...it's getting chilly outside! Luckily we just got heat turned on at Danville South View Upper Elementary

North Fields Collage.png

September 30, 2022

Our plumbing and mechanical work is progressing at Champaign Central North Fields! This project will be ready for the Maroons' sports this spring

Tri-Point Collage.jpg

August 12, 2022

Before and after! Check out our newly installed plumbing fixtures at Tri-Point Junior High in Piper City. This open-concept design will help promote social interaction between students as they return from summer break. Just kidding! Toilet and urinal partitions are soon to follow

IMG_4593-logo.jpg

July 1, 2022

Stay cool this summer! Yesterday, with the help of Custom Service Crane, Inc., our team set a new 275 ton air cooled chiller at Riddle Elementary in Mattoon. This new chiller, along with distribution pumps and updated controls, will be up and running for the students to enjoy when they return next month.

Golden Nugget Danville_edited_edited.jpg

June 24, 2022

Proud to be a part of Danville's new development. We've been contracted to perform refrigeration work for the new kitchen coolers and freezers

Mall Crane Pic.jpeg

May 11, 2022

Early morning crane pick at Market Place Mall with Custom Service Crane, Inc. Setting a new 40 ton roof top unit

IMG_8681.jpg

May 5, 2022

Construction is under way at our 64-unit apartment complex!

Underground plumbing is complete on the first building, and the second building is soon to follow. Can’t wait to tackle this plumbing and HVAC project this summer!

Beckman Collage.png

April 29, 2022

Plumbing for a purpose! We're proud to have a hand in renovating The Cancer Center at Illinois, a research laboratory located on UIUC's campus. Our work included new sinks, emergency showers, and gas connections to lab equipment.

IMG_8504-logo.jpg

March 25, 2022

Project Highlight: Eastern Illinois University Life Sciences Building

This project removed the existing 2-pipe unit ventilator system and replaced it with new all new custom air handling units located within a constructed penthouse. The new system is complete with campus chilled water, heating hot water, and glycol heat recovery system.

This project consists of multiple phases to allow partial occupancy during construction. United Mechanical has been working consistently through the winter months to allow cooling to be in full operation for the upcoming cooling season.

Carle OP Collage.png

January 21, 2022

Plumbing trim-out is complete at the new Carle Therapy Services at The Fields. Thank you Felmley-Dickerson Co. for a smooth project!

Atkins Collage.png

January 14, 2022

Following The Atkins Group's donation of the Stone Creek Golf Course to the University of Illinois, the former Kennedy's restaurant has been converted to a new pro shop. Our team reworked the existing plumbing and mechanical system to meet the new layout of the building. Welcome the new Atkins Golf Club at the University of Illinois!

Allerton Collage.jpg

December 30, 2021

This building at Allerton Park originally served as an ice house for Robert Allerton's mansion in the early 1900s. This building will now serve as lodging for Allerton's In-Residence Program, a way for artists and naturalists to use the park as inspiration while creating their own work. We're glad to be a part of this unique renovation!

IMG_6494_edited.jpg

November 23, 2021

Temporary services? We do that too! Here's a temporary boiler that was installed in a matter of three business days. This now allows us to update the failed boilers with new higher efficiency models while still maintaining temperature within the facility

IMG_0112 (002)_edited.jpg

October 29, 2021

We're putting the final touches on our plumbing fixtures at Westville High School's new field house. Between the public restrooms, locker rooms, and concessions area, we've kept our hands busy getting this facility ready for the athletes

IMG_3528.jpg

October 6, 2021

Thank you Custom Service Crane, Inc. for our third and final crane pick at Illinois Plasma Institute! Our team is putting the final touches on installing this 40 ton make-up air unit to serve independent research space. This project expanded the current research laboratory to include walk-in fume hoods and multiple dedicated stainless steel equipment exhaust

imageonline-co-logoadded (4).png

September 24, 2021

Our team is putting the final touches on our boiler replacement project at Mayo Elementary School in Paris, IL. Here’s a glimpse of two new condensing hot water boilers. These condensing boilers provide an enormous efficiency upgrade from the original steam/hot water heat exchanger that was originally installed in the late 1980s. In addition to the condensing boilers, we installed two new sectional steam boilers to serve the existing infrastructure. More pictures of the steam boilers to come!

New Chillers.png

September 10, 2021

Out with the old, in with the new. At a local industrial facility, we removed a pair of 120-ton split chillers and replaced them with a pair of 136-ton chillers, complete with sound reduction enclosures. This gives the facility increased cooling capacity without all of the noise that comes with it.

Exterior Sigma Phi Delta.jpg

August 20, 2021

Another summer, another fraternity house renovation with BARBER & DEATLEY, INC. This week we completed our plumbing and HVAC remodel at Sigma Phi Delta on UIUC’s campus. Our remodel included all new plumbing fixtures and VRF units to allow each student to have complete temperature control of their room.

IMG_7101.jpg

August 6, 2021

Another high-rise completed on UIUC's campus and ready for students to move in! This is a 13 story mixed-use building that will serve as apartments and commercial space for the University of Illinois. With over 240 apartments and 400 bathrooms, our plumbers certainly stayed busy over the past year and a half. Thank you to Findorff for another successful project.

IMG_3312.jpg

July 30, 2021

Our work is complete at Combe Laboratories in Rantoul. Our scope included hanging gas piping and unit heaters to heat this 50,000 sq ft addition. We also relocated the existing A/C system and provided new sanitary lines to serve the space.

01.jpg

July 9, 2021

Underground plumbing rough-in is complete for a local school addition. Now it's time to start water and vent piping for some gang bathrooms.

#1.jpg

July 2, 2021

We are proud to announce that our service division has signed an HVAC maintenance contract with Marketplace Mall in Champaign. This contract will include service and repairs of all heating and cooling systems in the building.

Central 5.jpg

June 25, 2021

We support our local athletics! Next time you're at Spalding Park, you'll see our banner along the left field wall. If you want us to sponsor your team, email us at info@umg-il.com

IMG_6750.jpg

June 18, 2021

We just finished our plumbing work in this new building for UIUC College of ACES Feed Technology Center. This building will serve as a breakroom and office space for researchers who are aiming to advance technology for animal food processing.

IMG_6689.HEIC

June 11, 2021

From a new construction high-rise to a little parking garage renovation in front of it, no job is too big or too small for us at United Mechanical Group.

Contact us at info@umg-il.com to get started on your next commercial plumbing or HVAC project

IMG_6564.HEIC

May 10, 2021

We are wrapping up our plumbing work at this new BlueCross BlueShield health insurance office in Mattoon alongside O'Malley Construction Company. It's always nice to see the end-product of a job after spending months putting it all together.

IMG_5055.jpg

April 5, 2021

Putting the final touches on our plumbing fixtures for this UIUC Soccer/Track Complex which will serve as a mixed-use building for these teams and their fans for many years to come

14th Pour 2.jpg

February 5, 2021

Our team completed the final deck layout for our 14 story high-rise project. We utilized cast-in place devices with precision hanger layout to decrease rough-in time for this mixed-use building.

Crane Pick 3.jpg

January 29, 2021

From tower cranes to mobile cranes, it was a productive week here at United Mechanical Group. We had multiple lifts on various projects including successfully hoisting our prefabricated domestic hot water system up to a 14th story penthouse and removing roof-mounted equipment totaling 44,000 lb from a local industrial facility.

IMG_2.jpg

January 22, 2021

We are proud to be working alongside the King Lar Company on a complete mechanical upgrade at a local industrial facility. The purpose of the upgrade is to replace all the original mechanical equipment that was beyond its useful life. Part of the project required the removal of a pair of 120 ton split chillers from a compact mechanical room. Our team completed the removal of these 5500 lb chillers in just a few hours. Communication is key during a task like this!

Gregory Hall 2.jpg

January 15, 2021

Another project completed! Thank you F.H. Paschen for allowing our team to assist in the classroom remodel at Gregory Hall located on the University of Illinois Campus. The entire project team did a great job completing this project through these challenging times.

Fabrication_edited.jpg

December 31, 2020

Here’s a glimpse of a prefabricated central domestic hot water system that will be located in the penthouse of our latest mixed-use high-rise project. This fabrication has been fully pressure tested and will be broken down to be hoisted up to the 14th story penthouse next month. Prefabrication like this can save days of on-site installation time. Let us show you how we can help on your next project. Contact United Mechanical Group at 

info@umg-il.com today.

imageonline-co-logoadded (1).jpg

December 18, 2020

Currently roughing in the interior fit-out for this BlueCross BlueShield office down in Mattoon alongside O'Malley Construction Company. Who knew that health insurance offices could look this nice!

Illinois Plasma.jpg

November 20, 2020

United Mechanical Group completed phase 1 for the Illinois Plasma Institute. We installed infrastructure for two new research laboratory rooms including new certified fume hoods, emergency showers/eye washes, and a deionized water system. Looking forward to phase 2 in the near future.

Crane Pick Pic 2.jpg

November 13, 2020

Last weekend's crane pick was a success thanks to Custom Service Crane Inc. Two 9400 lb cooling towers were removed from the roof of a campus building that is now being cooled by the University's chilled water distribution system.

Building%20Exterior_edited.jpg

November 6, 2020

Our new building sign is up! Thank you Deans Graphics for helping make our building look more like home.

Hub 2.png

October 16, 2020

From one high-rise to the next! This picture was taken from the rooftop of our completed high-rise and overlooks our current high-rise project. We're on the 8th floor and still climbing!

UIUC Hydrosystems Lab.jpg

October 2, 2020

We just wrapped up a roof repair at the UIUC Civil Engineering Hydrosystems Lab alongside Felmley-Dickerson Co. Here's to no more roof leaks.

SURS.jpg

September 11, 2020

Our newest HVAC project at SURS Champaign includes remodeling the existing mechanical system to fit the new architectural plans. We're thankful to be busy during these unprecedented times.

IMG_2026.jpg

September 4, 2020

Is your facility ready for winter? United Mechanical Group just replaced this original shell and tube heat exchanger for a local school district in preparation for winter. We still have time to upgrade your heating system as well.

IMG_4641 (002).JPG

August 28, 2020

Making progress on Demirjian Park Stadium, the new UIUC Soccer/Track Complex! Looking forward to the opening in November.

Kappa Sigma PicStitch.jpg

August 21, 2020

Just finished an HVAC remodel complete with new VRF units with Barber & DeAtley at Kappa Sigma. Enjoy your new cooling system during this hot summer!

Target.jpg

August 14, 2020

It's been a busy August alongside Novak Construction wrapping up this new Target. It's located on the corner of Sixth and Green and is attached to our larger mixed-use building project, The Dean.

Nothing%20Bundt%20Cakes_edited.jpg

August 7, 2020

Welcome to Champaign, Nothing Bundt Cakes! We had the pleasure of working on this new building which is now open for business. Next time you're craving something sweet, stop by Nothing Bundt Cakes and marvel at how great the plumbing is!

Hub Bathroom Combined.jpg

July 31, 2020

As the move-in date quickly approaches on the DEAN (17-story – 322 apartment complex), it’s nice to see final finishes in place with working plumbing. Our TEAM of plumbers have endured over a year of 10-12 hour days, night shifts, and weekend work to get to this point and we will continue the push until residents move in two weeks.

IMH Coil.jpg

July 24, 2020

When a healthcare client’s preferred vendor informed them that it would take 12 weeks to replace a damaged chilled water coil, they called for a second opinion. United Mechanical Group had a custom coil built and replaced with 100% cooling within 10 business days from the clients approval.

Hub 2 Pour.jfif

July 17, 2020

GETTING ELEVATED! The second floor of our next high-rise project was poured last week. We are utilizing cast-in place devices with precision hanger layout to decrease rough-in time for this 13-story mixed use building.

Diamond Dogs.jfif

July 10, 2020

United Mechanical Group is proud to be a sponsor of the 2020 Mahomet Diamond Dogs youth baseball club. Good luck on the upcoming season! United Mechanical Group proudly sponsors area youth programs; contact info@umg-il.com for more information.

Capture.PNG

July 2, 2020

United Mechanical Group is excited to be a part of the UIUC DIA Soccer/Track Complex currently under construction and scheduled for completion this fall. This $13.4 Mil, 21,300 square foot facility will provide locker rooms and team facilities for the UIUC soccer and track teams including treatment rooms and fan concessions. GO ILLINI!

United-Mechanical-Secondary-Logo-Short.p

217-954-0211

1501 N. Highland Ave., Champaign, IL 61821

© 2025 United Mechanical Group

bottom of page